Customization: | Available |
---|---|
Certification: | ISO9001, CSC, CE/EU, ECE, CE |
Material: | Steel Structure |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Codes and regulations | RID/ADR, IMDG, ASME VIII DIV 1-2017Ed; | |||
T75 UN PORTABLE TANK TIR;UIC;CSC;TC;FRA;CFR49;ISO 1496/3;ISO Standard 1161 | ||||
Guidelines for tank container | T75 UN Portable Tank | |||
ISO Size and type code | 42K7 | |||
Maximum Allowed Loading Weight | 17510kgs | |||
Tare Weight | 11700kgs | |||
Allowed stacking weight | 192000kgs | |||
Manufacturing license level | Inside tank | C3 | ||
outside tank | ||||
Max. Working Pressure(Mpa.) | Inside tank(MPa) | 0.75 | ||
outside tank(MPa) | -0.1(Vacuum) | |||
Min. Working Tempretrues | Inside tank | -196°C | ||
outside tank | -40°C | |||
Design Pressure(Mpa.) | Inside tank | 0.8 | ||
outside tank | -0.103 | |||
Design Tempretrues | Inside tank | -196 °C | ||
outside tank | 50 °C | |||
The Main material | Cover | inside tank | SA-240M 304 | |
outside tank | Q345R | |||
Shell | inside tank | SA-240M 304 | ||
outside tank | Q345R | |||
Frame work | Hollow Section | Q345-D--GB/T1591 | ||
Plates | Q345-D--GB/T1591 | |||
Rolled section | Q345-D--GB/T1591 | |||
Overall Size(Frame)/L*W*H/mm | 12192*2438*2591 | |||
Media | Inside tank | LNG | ||
Media Characteristics | Inside tank | explosive | ||
Paint | Frame | 30µm +40µm +50µm | ||
Shell | 30µm +40µm +50µm | |||
Total Volume(L) | 45700 | |||
Type Of Insulation | High Vacuum Multi-layer Insulation | |||
Material | Aluminium Foil | |||
Provision for Baffles | Five sets of surge baffles shall be installed. | |||
Corrosion allowance | Inside tank | 0mm | ||
outside tank | 0mm | |||
Nominal thickness | Shell | Inside tank | 6mm | |
outside tank | 4.0mm | |||
Head | Inside tank | 8mm | ||
outside tank | 6.0mm | |||
Air pressure test pressure | Inside tank(MPa) | 1.17 | ||
Fittings | All fittings, including valves and pipe sections shall be cleaned and then fitted to the tank. | |||
Welding joint coefficient | Inside tank | 1 | ||
outside tank | 0.85 | |||
Leakage Test and Nitrogen Purge | After cleaning, all valves, blind flanges, caps and connected piping are installed and a leak test is performed at16.2 bar using clean and dry air. The vessel will be delivered in a Nitrogen purged condition. Nitrogen will be used (O2 < 0.5% residual oxygen, 0.5 bar pressure). | |||
Main hazard category | 2.1 | |||
Design service life | 20 years | |||
Mode of transportation | Road,Sea,Railway | |||
Safety valve | Quantity | Two | ||
Set Pressure | +8bar | |||
Liquid Level gauge | Grade | 2.5 | ||
Quantity | One | |||
Measuring range(Kpa) | 0~2.0M H2O | |||
Loading and unloading device | Gas phase joint | Type | Flange connection | |
Nominal Diameter | DN50 | |||
liquid phase joint | Type | Flange connection | ||
Nominal Diameter | DN50 | |||
Pressure gauge | Quantity | One | ||
Measuring range(Mpa) | 0~1.6 | |||
Precision | 1.6 Class |
Q:What kind of Payment can you accept?
A:T / T and L/C is all right to us.
Q:Does your iso tank container meet with international requirement?
A:All of our tank container will be approval by BV or LR or CCS and meet with International Standard.
Q:How long will it takes to ship?
A:Around 15-25 working days.
Q: How about the Color , Specific configuration things?
A:It's up to you , most of them are optional and can be changed by your needs.